SOP-1101-01-AI_Training-and-Documentation

View diagram at source (pin)


Title: Training and Documentation

Effective DateSupersedes DateReason for UpdateOwner
YYYY-MM-DDN/A (New)New AI-SDLC SOPTraining Department / AI-IRB Liaison

1. Purpose and Scope

This SOP describes the method for identifying, analyzing, and preparing training and documentation materials necessary for effective deployment of AI-related enhancements or products to both internal functional units and external end-users under the AI-SDLC. Additionally, it outlines roles and responsibilities to ensure smooth knowledge transfer for AI-based or standard systems.

Scope:


2. Definitions


3. Roles and Responsibilities

RoleResponsibility
Training (Trainer/Group)Delivers training to internal or external personnel; ensures training content is accurate and current.
Technical SupportDefines initial training & documentation requirements; reviews produced materials; trains end-users.
Product GroupWorks with Technical Support to gather training needs; ensures SOW identifies all required training.
Development GroupProduces or updates technical documents as per AI-SDLC scope; collaborates with QA on documentation.
Quality Assurance (QA)Reviews, accepts/rejects documentation for completeness & accuracy; ensures it meets acceptance criteria.
AI-IRB LiaisonEnsures training meets AI ethical/compliance guidelines; reviews training content if mandated.
OperationsMay assist in environment setup for training sessions or staging environment usage.
Client/External UserReceives training; completes Pre-Needs Assessment Form (as relevant); provides feedback.

4. Procedure Activities

4.1 Identify Training Requirements (Gate 6 of AI-SDLC)

  1. Technical Support & Product Group review the Scope of Work (SOW) from the Requirements Phase.
  2. These groups create or update a Training Needs Document (TND) that:
    • Lists functionality requiring training (including any specialized AI functionality).
    • Identifies trainers (internal or external).
    • Defines audiences (internal Dev, QA, Ops, external clients, etc.).
    • Notes whether FOA or pilot sessions are required.

4.2 Pre-Needs Assessment Form (PNAF)

  1. For external training, Technical Support and Product Group co-author the PNAF.
  2. PNAF is sent to the Client for acceptance and sign-off of training scope, timeline, environment constraints, and compliance with AI-IRB if relevant.
  3. AI-IRB Liaison verifies compliance details if the system or training includes regulated AI features.

4.3 Documentation Creation and Review

  1. Once the Detailed Plan is complete (Gate 5 of AI-SDLC), the Development Group prepares all training documents:
    • User guides
    • Interface changes
    • Feature descriptions
    • Known issues (applicable to system or AI model limitations)
  2. Technical Support, Product Group, QA, AI-IRB Liaison (if mandated) review these documents.
  3. QA has final accept/reject authority. Rejections lead to rework until acceptance criteria are met.

4.4 FOA (First Office Application) Training Pilot (If applicable)

  1. For selected AI-based releases requiring FOA, Technical Support or Product Group conducts the first pilot training using the newly produced materials.
  2. The pilot runs in a staging environment or a similarly controlled environment.
  3. Trainees evaluate effectiveness. If documentation or training is lacking, it returns to Development or Technical Support for improvement.

4.5 General Training Pilot

  1. Technical Support trains end-users (non-technical) while Development trains technical or engineering staff if needed.
  2. The pilot is tested in an environment that simulates final usage.
  3. Feedback is collected to measure training success using the Training Evaluation Form (SOP-1100 reference).
  4. If training or documentation is not meeting needs, additional sessions or revised materials are provided.

4.6 Customer Training Classes

  1. After acceptance of the training pilot(s), Technical Support hosts training classes before deployment or during controlled rollout.
  2. Attendees fill out post-training Evaluation Forms.
  3. If training is insufficient, more sessions are scheduled or materials updated.
  4. Four weeks post-deployment, the Evaluation Form is recirculated to measure training retention and to gather final feedback.

4.7 Post-Implementation

  1. Technical Support monitors user support calls to identify any training shortfalls.
  2. QA or AI-IRB Liaison can trigger follow-up training if AI compliance or usage anomalies are observed.
  3. Lessons Learned feed into future training cycles.

5. Forms


6. Tools/Software/Technology


7. Exceptions


8. Revision History

VersionDateRevised ByChanges
1.0YYYY-MM-DDTraining DepartmentInitial AI-SDLC aligned SOP creation
1.1YYYY-MM-DDAI-IRB LiaisonAdded AI compliance checks for regulated training

End of SOP-1101-01-AI

@startuml
title “SOP-1101-01-AI: Training and Documentation Sequence”

participant “Technical Support” as TS
participant “Product Group” as PG
participant “AI-IRB Liaison” as AIIRB
participant “Development” as DEV
participant “Quality Assurance” as QA
participant “Operations” as OPS
participant “Client/External User” as CLIENT

TS -> PG: Review SOW and define initial training needs
PG -> TS: Draft or update Training Needs Document (TND)

alt AI-IRB needed
PG -> AIIRB: Submit training approach for AI compliance check
AIIRB -> PG: Approve or request changes
end

alt External Training Required
TS -> CLIENT: Send Pre-Needs Assessment Form (PNAF)
CLIENT -> TS: Return signed PNAF (or request changes)
end

DEV -> TS: Provide draft training documentation (user guides, known issues, etc.)
TS -> QA: Forward documentation for QA review
QA -> QA: Review doc completeness and correctness
alt Documentation Rework Needed
QA -> DEV: Request revisions
DEV -> QA: Resubmit corrected documentation
end
QA -> TS: Documentation Accepted

alt FOA Training Pilot
TS -> PG: Coordinate FOA pilot training
TS -> OPS: Request staging environment readiness
OPS -> TS: Confirm environment set up
TS -> TS: Conduct FOA training pilot
TS -> PG: Gather FOA pilot feedback
alt FOA training insufficient
TS -> DEV: Request doc or content fix
DEV -> TS: Provide updated materials
end
end

TS -> TS: Schedule Training Pilot (general)
TS -> TS: Deliver pilot training to internal and/or external staff
TS -> PG: Collect pilot feedback
alt Pilot feedback insufficient
TS -> DEV: Additional revision or re-training
end

TS -> CLIENT: Conduct final customer training classes
CLIENT -> TS: Provide training evaluation
alt Additional training needed
TS -> DEV: Adjust materials, repeat session(s)
end

note over TS,PG,QA,OPS: Post-release, observe calls and usage to verify training success
@enduml

Short textual explanation: This sequence diagram illustrates the entire training and documentation workflow for SOP-1101-01. After Technical Support and Product Group define the Training Needs Document, possible AI-IRB approvals and Pre-Needs Assessments occur. Development provides draft documentation, which Quality Assurance reviews for completeness. If needed, rework cycles take place. Then a FOA Training Pilot or a General Training Pilot might be conducted. Finally, customer training classes happen, with participant evaluations and any necessary follow-up training actions.